Tisknout
BASIC COMPONENTS OF THE DRILL RIG
OPTIONAL COMPONENTS
DRILLING RIG REQUEST EQUIPMENT
Products HVS 2xx
rozbalit všeProducts
HVS 2xx
USEExploratory boring for heat pumps, carrying out anchor, micro pile, core and other drill holes used in construction, geology and hydrogeology.
Kinematics of the drilling rig
Erection of the mast into the working position | |
The mast shift in the drilling axis direction | |
Turning the mast | |
Shift of the superstructure against the frame | |
Undercarriage belt expansion | |
Setting on the ground using struts |
Drilling rig size
Minimum width: | 780 mm |
Maximum width: | 1200 mm |
Length without mast: | 3000 mm |
Weight with basic equipment: | 5000 kg |
Drive
HVS 246 Hatz combustion engine | |
Power acc. to DIN 70020: | 46 kW |
HVS 236 Electromotor 3000 ot/min: | 36 kW |
HVS 254/278 Deutz combustion engine | |
Power: | 54kW / 78 kW |
Crawlers
Traction force of the crawlers: | 6 kNm |
Speed: | max. 3 km/h |
Specific ground pressure: | 2x 3400 cm2 |
Hydraulic system
Power adjusted piston pump: | 0-120 l/min |
System pressure: | 240 bar |
Zubové čerpadlo: | 24 l/min |
System pressure: | 220 bar |
Tank capacity: | 250 l |
Electrical system
Accumulator: | 12V 88Ah VARTA SILVE with silver technology, starting current up to 850A |
Alternator: | 14V 55A BOSCH |
Starter: | 12V BOSCH |
Electrical wiring: | Floating - allows welding on the rig when it is being used |
Mast acc. to rod lenght
Lenght of drill rod: | 750 - 2500 mm |
Thrust - adjustable: | 0 - max. 37 kN |
Pull: | 50 kN |
Drilling speed: | 0,2 m/s |
Rapid traverse into the drill: | 1,0 m/s |
Rapid traverse from the drill: | 0,8 m/s |
Shift length on the holder: | 600 mm |
Mast pull on the holder | 65 kN |
Clip, single gripping
Grip range: | 50 - 219 mm |
Gripping force: | 100 kN |
Clip, double tearing
Grip range: | 50 - 219 mm |
Gripping force: | 100 kN |
Tearing moment: | 16 kNm |
Car drilling head
Fixed | |
Dumping | |
Mucking | |
Dumping and swinging away | |
Dumping and mucking |
Chuck head | |
Flush head | |
Mast crown | |
Winches | |
Sludge device | |
Flush pump |
Electrical equipment
Drilling rig critical state surveillance: | Working liquid temperatures working liquid amounts suction shut-off etc. |
Drilling rig lighting: | Currently - 3 main double headlamps, 1 single in the rear and control panel lighting. |
Installation of 12VDC / 230VAC converter: | Maximum output from 300W to 4000W, for angle grinding machines, drilling machines, pumps etc. |
Mast inclination measuring device - +/- 15 degrees for X and Y-axes: | The device can be improved by using the automatic mast adjustment device with a measurable range of +/- 15 degrees. |
Realizované soupravy HVS 2xx
HVS 278
dokončeno: 2003
Malá vrtná souprava pro firmu Mengis v Luzernu.
Zaujala vás naše nabídka?
Poptávkový formulář
ReferenceDalší reference
Speciální zakázky
Naše firma je schopná vyhovět i v případě speciálních zakázek.
Více informacíServis do 24 hodin
Naším standardem je zajištění servisu do 24 hodin, a to i o víkendech, o svátcích a v době prázdnin.
Více informací